Our Projects

Here is a sample of some of our projects:

Click on the link below, or scroll down.

Walkway - Park Orchards

Client Brief:

Create a walkway to the front door that didn’t overwhelm the surroundings and to be random shapes and sizes.

What we did:

  • Create 5 separate platforms that wound through the existing rocks, each a different size and shape to meet the clients brief.

  • Special attention given to shaping  the platforms where possible around the natural form of the rock and install decklights for night use.

Bathroom Renovation - Tallow Wood Dve Greensborough.

Client Brief:

Remove the wall between the bathroom and toilet and extent the hallway wall to create 1 large bathroom. Replace the 2 different sized windows with 2 the same size and create a modern bathroom with a walk in shower and free standing bath.

What we did:

  • Complete strip out of all components.

  • Remove one wall and extend second wall

  • Relocate the door and install a new cavity sliding door for access

  • Relocate the shower and the bath

  • Completely replace the floor

  • Remove existing windows and reframe to suit 2 new windows the same size

  • Create a walk in shower

  • Waterproof the entire floor as well as wet areas

  • Install floor to ceiling tiles and replace the plaster ceiling

  • Rewire the separate rooms and install a heater fan light combo and downlight over vanity

  • Relocate the floor heating duct

Testimonial:

We are very pleased with this finished bathroom, lots of compliments, and we felt in safe hands with both yourself Nigel & the happy precise work of Shane throughout the process , also very accomodating with small changes. 

Box Hill - Bathroom Renovation

Client Brief:

The client brief was to update the bathroom to a modern look with a feature tile wall. Increase the size of the pokie shower and increase the light in the room as there were no windows.

What we did:

  • Complete strip out of all components.
  • Enlarge the shower footprint by reshaping the concrete floor and moving the shower screen forward approx. 400mm
  • Removed the cornice on the ceiling and installed tiles from floor to ceiling and “squareset” the junction between wall tiles and ceiling.
  • Reframed the wall to allow a larger recessed shaving cabinet to be installed
  • Completely waterproof the floor in addition to the wet area
  • Install additional downlights to create more light

Wheelchair friendy bathroom - Parkville

Client Brief:

Elderly client wanting to update bathroom to be wheelchair friendly due to developing mobility issues

What we did:

  • Complete strip out of all components.

  • Repair damaged flooring

  • Create a walk in shower with flat floor entry

  • Waterproof the entire floor and wet areas of the bathroom

  • Install a higher than standard toilet for ease of use

  • Reframe wall to accept a recessed shaving cabinet

  • Install a heater fan light combo